Sun, 21 Feb 2010 {6:54 pm}
---

I haven't been inside in a couple weeks, but they should be done with the dry-walling, and as you can see with the latest photo, they are finishing up the siding. Last I heard they were working on the kitchen. I don't have a whole lot to say about it since I haven't been inside in a while. I might try stopping by after work sometime and see how things have progressed internally.
Comments(0)
/
Add thy own
Fri, 05 Feb 2010 {10:35 pm}
---

We had our pre-drywall builder conference today. In addition to what was finished last week, they have now completed wiring, wall insulation, and there's a front door. I believe they were having some municipal inspections today and they will be drywalling most of next week. We've been given March 25th as our New Homeowner Orientation and a few days later we should close on the house and be able to move in.
Comments(3)
/
Add thy own
Sun, 31 Jan 2010 {9:59 pm}
---

Not a whole lot has been done in the last couple weeks. They put on all the windows and the sliding doors on the back of the house. The garage floor has been poured, and they built the stairs. Also, the plumbing is in, the furnace is in, and some of the electric wiring has been done. The phone and cable still need to be installed as well as the security system wiring and the insulation before they can begin dry-walling.



Comments(0)
/
Add thy own
Sun, 17 Jan 2010 {6:27 pm}
---

This week they finished the outside walls and got the roof put on. We went into the garage and took a few photos of the inside. They still need to build the stairs, but it looks like they're a lot closer to starting on all of the cosmetic stuff.
Comments(0)
/
Add thy own
Sun, 10 Jan 2010 {3:00 am}
---
We drove by last week but didn't take any pictures. They had the first floor framing almost done. This week they were will working again when we went by, so we only took one photo from the entry of the street. We haven't charged our camera in a while, so this was taken with Ally's phone. They've almost got both floors framed. I imagine they'll begin working on the roof soon.
Comments(0)
/
Add thy own
Tue, 29 Dec 2009 {2:59 pm}
---
And here's the week three photos. Not a whole lot has happened since it was Christmas this week. The space around the basement walls have been filled in and the garage floor has been poured. Also support beams have been placed in the basement.


Comments(0)
/
Add thy own
Sat, 19 Dec 2009 {6:22 pm}
---
Week 2 of construction

And here are some more photos of the basement. As you can see, the walls are up and a small amount of basement plumbing is in. The area around the outside of the walls was dug out, so I couldn't get real close.